Panel Formwork for Efficient Construction Periods

Product Details
After-sales Service: Available
Warranty: 1 Years
Certification: ISO, CE
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
3000000 RMB
Type of Ownership
Limited Company
Terms of Payment
LC, T/T, D/P, PayPal, Small-amount payment
  • Panel Formwork for Efficient Construction Periods
  • Panel Formwork for Efficient Construction Periods
  • Panel Formwork for Efficient Construction Periods
  • Panel Formwork for Efficient Construction Periods
  • Panel Formwork for Efficient Construction Periods
  • Panel Formwork for Efficient Construction Periods
Find Similar Products

Basic Info.

Model NO.
MP
Material
Steel
Type
Wall Formwork
Code
6061-T6
Construction Period
5 Days
Load Capacity
60kn
After Sale Service
Available
Transport Package
Standard
Trademark
MACPEX
Origin
China
HS Code
8480411000
Production Capacity
50000

Product Description

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation After short period of training, workers can easily learn to install and dismantle the formwork.
3.Construction period 3-5 days per storey.
4.Machine assistance Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used.
5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.
Panel Formwork for Efficient Construction PeriodsPanel Formwork for Efficient Construction PeriodsPanel Formwork for Efficient Construction PeriodsPanel Formwork for Efficient Construction Periods

Panel Formwork for Efficient Construction Periods


Our panel formwork offers efficient construction forms for high-quality, durable, and versatile concrete formwork. With advanced H20 formwork, steel props, and innovative aluminum systems, our customizable solutions ensure reliable and cost-effective construction. Experience the next generation of formwork technology with our cutting-edge aluminum and steel options for walls, stairs, columns, slabs, and scaffolding equipment.


Panel Formwork for Efficient Construction Periods


Product Name:


Panel Formwork for Efficient Construction Periods


Company Name:


SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.


Keywords:


Efficient Construction Forms, High-Quality Panel Formwork, Advanced H20 Formwork Solution, Durable Steel Props, Innovative Aluminum Formwork System, Versatile Concrete Formwork, Effective Wall Formwork, Reliable Stair Formworks, Precision Column Moulds, Efficient Monolithic Casting, Aluminum Slab Formwork Solution, Sleek Aluminum Table Formwork, Strong Aluminum Beam Formwork, Secure Aluminum Wall Formwork, Flexible Aluminum Stair Formwork, Sturdy Scaffold Equipment, Cost-Effective Construction Forms, Customizable Panel Formwork System, Next-Generation H20 Formwork, High-Strength Steel Props, Cutting-Edge Aluminum Formwork Technology, Flexible Concrete Formwork Solution, Quick and Easy Wall Formworks, Innovative Stair Formwork System, Versatile Column Mould Options, Advanced Slab Casting Techniques


Panel Formwork for Efficient Construction Periods

Certificate:


SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. offers a range of high-quality panel formwork solutions for efficient construction periods. Our innovative aluminum and steel formwork systems are versatile, durable, and cost-effective. From wall and stair formworks to column moulds and slab casting techniques, our cutting-edge technology ensures quick and easy construction processes.


Panel Formwork for Efficient Construction PeriodsPanel Formwork for Efficient Construction PeriodsPanel Formwork for Efficient Construction Periods

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier