6061-T6 Aluminum Formwork with 5-Day Construction Period

Product Details
After-sales Service: Available
Warranty: 1 Years
Certification: ISO, CE
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
3000000 RMB
Type of Ownership
Limited Company
Terms of Payment
LC, T/T, D/P, PayPal, Small-amount payment
  • 6061-T6 Aluminum Formwork with 5-Day Construction Period
  • 6061-T6 Aluminum Formwork with 5-Day Construction Period
  • 6061-T6 Aluminum Formwork with 5-Day Construction Period
  • 6061-T6 Aluminum Formwork with 5-Day Construction Period
  • 6061-T6 Aluminum Formwork with 5-Day Construction Period
  • 6061-T6 Aluminum Formwork with 5-Day Construction Period
Find Similar Products

Basic Info.

Model NO.
MP
Material
Steel
Type
Wall Formwork
Code
6061-T6
Construction Period
5 Days
Load Capacity
60kn
After Sale Service
Available
Transport Package
Standard
Trademark
MACPEX
Origin
China
HS Code
8480411000
Production Capacity
50000

Product Description

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation After short period of training, workers can easily learn to install and dismantle the formwork.
3.Construction period 3-5 days per storey.
4.Machine assistance Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used.
5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.
6061-T6 Aluminum Formwork with 5-Day Construction Period6061-T6 Aluminum Formwork with 5-Day Construction Period6061-T6 Aluminum Formwork with 5-Day Construction Period6061-T6 Aluminum Formwork with 5-Day Construction Period

Introducing the 6061-T6 Aluminum Formwork by SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. This fast and durable formwork allows for efficient and rapid construction. With versatile panel options and reliable support systems, it is perfect for monolithic casting methods. From sturdy column molds to innovative slab and table formwork, this system ensures secure and efficient construction of beams, walls, stairs, and more. Trust in our quality scaffold equipment for quick and dependable results.


6061-T6 Aluminum Formwork with 5-Day Construction Period


Product Description:


Experience fast and efficient construction with our 6061-T6 Aluminum Formwork. This durable formwork allows for rapid building with versatile panel, strong H20, and reliable steel prop. It's perfect for monolithic casting methods, sturdy column molds, innovative slab, practical table, secure beam, efficient wall, safe stair, and quality scaffold equipment. Trust our dependable aluminum formwork for quick construction and reliable results.


6061-T6 Aluminum Formwork with 5-Day Construction Period

Certificate: SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. offers the 6061-T6 Aluminum Formwork, a fast, durable, and efficient solution for concrete construction. With versatile panel formwork, strong H20 formwork, and reliable steel props, this system allows for rapid building using monolithic casting methods. It includes sturdy column molds, innovative slab formwork, practical table formwork, secure beam formwork, efficient wall formwork, safe stair formwork, quality scaffold equipment, and robust H20 concrete formwork. Dependable aluminum column molds, effective monolithic casting, durable aluminum slab formwork, flexible aluminum table formwork, stable aluminum beam formwork, sturdy aluminum wall formwork, safe aluminum stair formwork, and a reliable scaffold system complete this comprehensive offering.

6061-T6 Aluminum Formwork with 5-Day Construction Period6061-T6 Aluminum Formwork with 5-Day Construction Period6061-T6 Aluminum Formwork with 5-Day Construction Period

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier