Items | Aluminium formwork |
1. Material | Aluminium alloy 6061-T6 |
2.Installation | After short period of training, workers can easily learn to install and dismantle the formwork. |
3.Construction period | 3-5 days per storey. |
4.Machine assistance | Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used. |
5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted. |
6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
7.Formwork stability | The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting. |
8.Scrap value | The scrap value is about 50% of the new panel. |
Company Name: SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
Product Name: High Quality Panel Formwork for High Rise Buildings
Keywords: High Rise Building Forms, Quality Panel Formwork, Formwork for High Rise Buildings, H20 Panel Formwork, Steel Prop Formwork, Aluminum Concrete Formwork, Wall Formwork System, Stair Formwork Solutions, Column Mould for Construction, Monolithic Casting Formwork, Aluminum Slab Formwork, Aluminum Table Formwork System, Aluminum Beam Formwork, Aluminum Wall Formwork System, Aluminum Stair Formwork Solutions, Scaffold for High Rise Buildings, Advanced Panel Formwork, Efficient H20 Formwork, Durable Steel Prop Formwork, Innovative Concrete Formwork, Versatile Wall Formwork, Customizable Stair Formworks, Precise Column Mould, Enhanced Monolithic Casting, Aluminum Slab and Beam Formwork