After-sales Service: | Available |
---|---|
Warranty: | 1 Years |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Items | Aluminium formwork |
1. Material | Aluminium alloy 6061-T6 |
2.Installation | After short period of training, workers can easily learn to install and dismantle the formwork. |
3.Construction period | 3-5 days per storey. |
4.Machine assistance | Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used. |
5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted. |
6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
7.Formwork stability | The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting. |
8.Scrap value | The scrap value is about 50% of the new panel. |
Discover our high-quality lightweight aluminum formwork system, designed for monolithic casting. With a load capacity of 60kn, it's perfect for wall, stair, and column formworks. Our customizable solution is ideal for construction projects.
Get the Lightweight Aluminum Formwork with 60kn Load Capacity from SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. Perfect for wall, column, and slab formwork. Customizable and high load capacity.
Our lightweight aluminum formwork is designed for high load capacity and offers customizable solutions for various construction needs. It includes panel formwork, H20 formwork, steel props, and more. Perfect for monolithic casting, it is durable and easy to use. Explore our range of aluminum formwork products and accessories for efficient and reliable construction.