Product Highlights
- Rapid Construction Period: 3-5 days per storey with efficient installation.
- No Plastering Required: Smooth finish after removal eliminates plastering costs.
- High Load Capacity: 60 KN per square meter ensures stability and uniform load.
- No Crane Assistance Needed: Lightweight design allows manual shifting and assembly.
- High Scrap Value: Scrap value is approximately 50% of the new panel cost.
- Durable Material: Made from firm Aluminium alloy 6061-T6 and steel.
- 1-Year Warranty: Comprehensive 1-year warranty coverage included.
- ISO and CE Certified: Meets international safety and quality standards.
Product Attributes
- Customization
- Available
- After-sales Service
- Available
- Warranty
- 1 Years
- Model NO.
- MP
- Certification
- ISO, CE
- Material
- Steel
- Type
- Wall Formwork
- Code
- 6061-T6
- Construction Period
- 5 Days
- Load Capacity
- 60kn
- After Sale Service
- Available
- Transport Package
- Standard
- Trademark
- MACPEX
- Origin
- China
- HS Code
- 8480411000
- Production Capacity
- 50000
Product Images of High Rise Building Aluminum Slab Concrete Formwork with Competitive Price
Find Similar Products
Product Description
| Items | Aluminium formwork |
| 1. Material | Aluminium alloy 6061-T6 |
| 2.Installation | After short period of training, workers can easily learn to install and dismantle the formwork. |
| 3.Construction period | 3-5 days per storey. |
| 4.Machine assistance | Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used. |
| 5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted. |
| 6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
| 7.Formwork stability | The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting. |
| 8.Scrap value | The scrap value is about 50% of the new panel. |



High Rise Building Formwork with Competitive Price
Discover our innovative and versatile formwork solutions for high-rise buildings. Our durable steel and aluminum systems offer efficient, rapid, and precise construction. From walls and slabs to stairs and columns, our customizable formwork options provide reliable and cost-effective solutions. Experience the benefits of our lightweight and flexible designs, ensuring a smooth construction process. Trust our high-quality panel and H20 formwork systems for your next project.
Shipment:
Get the best high-rise building formwork at a competitive price from SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. Our efficient and durable formwork solutions include innovative steel and aluminum options for walls, slabs, beams, and more. Choose our reliable scaffold systems and high-quality panel formwork for customizable, lightweight, and flexible construction. Explore our range of precise and economical formwork options today!
Certificate:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. offers high-quality, durable, and innovative formwork solutions for high-rise buildings. Our competitive prices, efficient design, and versatile options make us the reliable choice for all your formwork needs.


About the Supplier
Company Profile
Our company is founded in 2006 and headquartered in Qingdao, a world class hub port, with three major manufacturing bases located in Qingdao, Qingzhou, and Weifang. Shandong, as a leading province in China's machinery manufacturing industry, represents the top-tier quality of machinery manufacturing in China. This industrial cluster advantage brings us cost advantages and innovative development for our enterprises.
Our products cover ready mix and precast concrete mixing production line, dry mix plant, dry mortar production line, asphalt mixing production lines, concrete forming equipment production lines, such as RCC pipe making machines, trench forming machines, concrete sprayer vehicles and building material recycling production lines. Products obtained the CE certificate.
We are a team with 20 years of experience in manufacturing mixing equipment. Our technical backbone with exceptional innovation capabilities and industry insights. We aspire to reach the Apex of machinery manufacturing, which is the origin and goal of Macpex. Mix for value is our unwavering pursuit, motivating us to deliver value to our customers through our high-quality products.
We possess the ability to offer non-standard, tailored solutions, providing customers in over 50 countries worldwide with both standard and specially customized equipment solutions. Our marketing team is always ready to answer customer inquiries promptly, offering personalized optimal solutions. Our services are efficient, timely, professional, and meticulous. Our professional logistics team ensures prompt delivery, while our experienced installation team handles on-site after-sales, installation, and debugging to perfection.
About Our Factory & Business Background
- Address
- Lu Jia Cun Industrial Park, Qingdao, Shandong, China
- Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
FAQ
- What is the construction period for one storey?
- The construction period is 3-5 days per storey.
- Does this formwork require a crane for installation?
- No, it does not require a crane for shifting and assembly.
- Is plastering needed after removing the formwork?
- No, the smooth effect eliminates the need for plastering.
- What is the load capacity of the formwork?
- The load capacity is 60 KN per square meter.
- What is the scrap value of the panels?
- The scrap value is about 50% of the new panel.
- What materials are used for the formwork?
- It is made of Aluminium alloy 6061-T6 and steel.
- What is the warranty period?
- We provide a 1-year warranty.
- What certifications does the product have?
- The product holds ISO and CE certifications.
Send your message to this supplier
People who viewed this also viewed
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
Find Similar Products By Category
- Supplier Homepage
- Products
- Construction machinery
- Forms
- High Rise Building Aluminum Slab Concrete Formwork with Competitive Price
Related Categories
Hot Searches
- China Aluminum Factories
- Aluminum Profile Factories
- Aluminum Frame Factories
- Aluminum Panel Factories
- Formwork Building
- Formwork Materials
- Aluminum Formwork
- System Formwork
- Column Formwork
- Top 10 Aluminum
- Aluminum Trends
- High-Rise Building Formwork Bulkbuy