Aluminum Formwork with 60610-T6 for Wall Slab Panel

Product Details
After-sales Service: Available
Warranty: 1 Years
Certification: ISO, CE
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
3000000 RMB
Type of Ownership
Limited Company
Terms of Payment
LC, T/T, D/P, PayPal, Small-amount payment
  • Aluminum Formwork with 60610-T6 for Wall Slab Panel
  • Aluminum Formwork with 60610-T6 for Wall Slab Panel
  • Aluminum Formwork with 60610-T6 for Wall Slab Panel
  • Aluminum Formwork with 60610-T6 for Wall Slab Panel
  • Aluminum Formwork with 60610-T6 for Wall Slab Panel
  • Aluminum Formwork with 60610-T6 for Wall Slab Panel
Find Similar Products

Basic Info.

Model NO.
MP
Material
Steel
Type
Wall Formwork
Code
6061-T6
Construction Period
5 Days
Load Capacity
60kn
After Sale Service
Available
Transport Package
Standard
Trademark
MACPEX
Origin
China
HS Code
8480411000
Production Capacity
50000

Product Description

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation After short period of training, workers can easily learn to install and dismantle the formwork.
3.Construction period 3-5 days per storey.
4.Machine assistance Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used.
5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.
Aluminum Formwork with 60610-T6 for Wall Slab PanelAluminum Formwork with 60610-T6 for Wall Slab PanelAluminum Formwork with 60610-T6 for Wall Slab PanelAluminum Formwork with 60610-T6 for Wall Slab Panel
 
 

Introducing the H20 Formwork by SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. Accelerate your construction projects with our efficient and rapid formwork system. Perfect for quick and monolithic casting, our formwork panels, steel props, and aluminum molds ensure speedy and high-quality results. Explore our range of solutions for walls, slabs, columns, beams, and stairs. Get the job done faster with our advanced formwork technology.

Aluminum Formwork with 60610-T6 for Wall Slab Panel

 

Shipment:

 

Get the H20 Formwork from SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. for quick and efficient construction. Our formwork panels, steel props, and aluminum molds ensure accelerated construction periods. Perfect for monolithic casting, table formwork systems, and more.

Aluminum Formwork with 60610-T6 for Wall Slab Panel
Certificate:

 
 

Company Name: SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.

 

Product Name: H20 Formwork for Accelerated Construction Periods

 

Keywords: Formwork panels, Accelerated construction, Steel props, Concrete wall forms, Aluminum slab forms, Column molds, Quick construction forms, Monolithic casting forms, Table formwork systems, Beam formwork solutions, Staircase molds, Scaffolding for formwork, Efficient formwork panels, H20 formwork systems, Rapid construction forms, Aluminum wall molds, Concrete column forms, Speedy construction molds, Wall formwork solutions, Slab formwork design, Column formwork systems, Aluminum beam molds, Stair formwork equipment, Formwork for accelerated projects, Aluminum formwork systems

Aluminum Formwork with 60610-T6 for Wall Slab PanelAluminum Formwork with 60610-T6 for Wall Slab PanelAluminum Formwork with 60610-T6 for Wall Slab Panel

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier