Aluminum Panel Mould Formwork for High Rise
Contact Supplier
Product Highlights
- Fast Construction Speed: 3-5 days per storey with easy installation after short training.
- High Load Capacity: 60 KN per square meter ensuring stability and preventing shifting.
- Cost Saving Design: Smooth finish eliminates plastering needs and saves cleaning costs.
- Crane Efficiency: No crane required for assembly, allowing crane use for other tasks.
- High Scrap Value: Scrap value is about 50% of the new panel cost.
- Durable Material: Made of Aluminium alloy 6061-T6, firm enough to prevent bursting.
- Certified Quality: ISO and CE certified for reliable performance and safety.
- Available Support: After-sales service available with 1-year warranty coverage.
Product Attributes
- Customization
- Available
- After-sales Service
- Available
- Warranty
- 1 Years
- Model NO.
- Panel
- Certification
- ISO, CE
- Material
- Steel
- Type
- Wall Formwork
- Transport Package
- Standard
- Trademark
- MACPEX
- Origin
- China
- HS Code
- 8480411000
- Production Capacity
- 50000
Product Images of Aluminum Panel Mould Formwork for High Rise
Find Similar Products
Product Description
| Items | Aluminium formwork |
| 1. Material | Aluminium alloy 6061-T6 |
| 2.Installation | After short period of training, workers can easily learn to install and dismantle the formwork. |
| 3.Construction period | 3-5 days per storey. |
| 4.Machine assistance | Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used. |
| 5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted. |
| 6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
| 7.Formwork stability | The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting. |
| 8.Scrap value | The scrap value is about 50% of the new panel. |



workshop:
Shipment:
Certificate:


About the Supplier
This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASR2552042". Items marked "" are certified.
Company Profile
Our company is founded in 2006 and headquartered in Qingdao, a world class hub port, with three major manufacturing bases located in Qingdao, Qingzhou, and Weifang. Shandong, as a leading province in China's machinery manufacturing industry, represents the top-tier quality of machinery manufacturing in China. This industrial cluster advantage brings us cost advantages and innovative development for our enterprises.
Our products cover ready mix and precast concrete mixing production line, dry mix plant, dry mortar production line, asphalt mixing production lines, concrete forming equipment production lines, such as RCC pipe making machines, trench forming machines, concrete sprayer vehicles and building material recycling production lines. Products obtained the CE certificate.
We are a team with 20 years of experience in manufacturing mixing equipment. Our technical backbone with exceptional innovation capabilities and industry insights. We aspire to reach the Apex of machinery manufacturing, which is the origin and goal of Macpex. Mix for value is our unwavering pursuit, motivating us to deliver value to our customers through our high-quality products.
We possess the ability to offer non-standard, tailored solutions, providing customers in over 50 countries worldwide with both standard and specially customized equipment solutions. Our marketing team is always ready to answer customer inquiries promptly, offering personalized optimal solutions. Our services are efficient, timely, professional, and meticulous. Our professional logistics team ensures prompt delivery, while our experienced installation team handles on-site after-sales, installation, and debugging to perfection.
About Our Factory & Business Background
- Address
- Lu Jia Cun Industrial Park, Qingdao, Shandong, China
- Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
FAQ
- What is the material of the aluminum formwork?
- The material is Aluminium alloy 6061-T6, which is firm and durable.
- How long does it take to construct one storey?
- The construction period is 3-5 days per storey.
- Is a crane required for installation?
- No, it does not require a crane for shifting and assembly.
- What is the load capacity of the formwork?
- The load capacity is 60 KN per square meter.
- Do I need to plaster the walls after removing the formwork?
- No, the smooth effect after removing the formwork means there is no need to plaster.
- What is the warranty period?
- The warranty period is 1 year.
- What certifications does the product have?
- The product has ISO and CE certifications.
- What is the scrap value of the aluminum panels?
- The scrap value is about 50% of the new panel.
Send your message to this supplier
People who viewed this also viewed
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
Find Similar Products By Category
- Supplier Homepage
- Products
- Construction machinery
- Forms
- Aluminum Panel Mould Formwork for High Rise
Related Categories
Hot Searches
- Wall Panel Factories
- Aluminum Panel Factories
- PVC Wall Panel Factories
- Steel Panel Factories
- Used Formwork
- Formwork Materials
- Aluminum Formwork
- System Formwork
- Formwork Frames
- Formwork Bulkbuy