• Panel Formwork for Efficient and Quick High Rise Building Construction
  • Panel Formwork for Efficient and Quick High Rise Building Construction
  • Panel Formwork for Efficient and Quick High Rise Building Construction
  • Panel Formwork for Efficient and Quick High Rise Building Construction
  • Panel Formwork for Efficient and Quick High Rise Building Construction
  • Panel Formwork for Efficient and Quick High Rise Building Construction

Panel Formwork for Efficient and Quick High Rise Building Construction

After-sales Service: Available
Warranty: 1 Years
Certification: ISO, CE
Material: Steel
Type: Wall Formwork
Code: 6061-T6
Diamond Member Since 2018

Suppliers with verified business licenses

Basic Info.

Model NO.
MP
Construction Period
5 Days
Load Capacity
60kn
After Sale Service
Available
Transport Package
Standard
Trademark
MACPEX
Origin
China
HS Code
8480411000
Production Capacity
50000

Product Description

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation After short period of training, workers can easily learn to install and dismantle the formwork.
3.Construction period 3-5 days per storey.
4.Machine assistance Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used.
5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.
Panel Formwork for Efficient and Quick High Rise Building ConstructionPanel Formwork for Efficient and Quick High Rise Building ConstructionPanel Formwork for Efficient and Quick High Rise Building ConstructionPanel Formwork for Efficient and Quick High Rise Building Construction

Panel Formwork for Efficient and Quick High Rise Building Construction


Our efficient panel formwork is designed for quick construction of high rise buildings. With options for steel prop, aluminum concrete, and monolithic casting formwork, as well as various other systems for walls, slabs, beams, and stairs, our formwork solutions are perfect for your construction needs.

Panel Formwork for Efficient and Quick High Rise Building Construction

Shipment: Panel Formwork for Efficient and Quick High Rise Building Construction



Discover our efficient panel formwork system for quick high rise construction. Our steel and aluminum formwork solutions include wall formwork, column moulds, monolithic casting formwork, slab formwork, table formwork, beam formwork, and stair formwork. Perfect for high rise buildings.

Panel Formwork for Efficient and Quick High Rise Building Construction
Certificate:

Company Name: SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.


Product Name: Panel Formwork for Efficient and Quick High Rise Building Construction


Keywords: Efficient panel formwork, Quick high rise construction, Formwork for highrise buildings, Efficient wall formwork, Steel prop formwork, Aluminum concrete formwork, Column mould for construction, Monolithic casting formwork, Aluminum slab formwork, Aluminum table formwork, Aluminum beam formwork, Aluminum wall formwork, Aluminum stair formwork, Scaffold for high rise buildings, Efficient H20 formwork, Steel prop for construction, Concrete formwork panels, Wall formwork for buildings, Stair formworks for construction, Efficient column mould, Monolithic casting for high rise, Aluminum slab formwork panels, Aluminum table formwork system, Aluminum beam formwork system, Aluminum wall formwork panels, Aluminum stair formwork system

Panel Formwork for Efficient and Quick High Rise Building ConstructionPanel Formwork for Efficient and Quick High Rise Building ConstructionPanel Formwork for Efficient and Quick High Rise Building Construction

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now