6061-T6 Aluminum Formwork for Swift Construction

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
  • Audited Supplier
  • 9 yrs

Contact Supplier

Product Highlights

  • Swift Construction Speed: Construction period of 3-5 days per storey with easy installation and dismantling.
  • No Plastering Required: Smooth surface after removal eliminates the need for additional plastering costs.
  • High Load Capacity: Supports 60 KN per square meter, ensuring stability and preventing shifting.
  • Cost-Effective Scrap Value: Scrap value is approximately 50% of the new panel price.
  • Versatile Application: Suitable for walls, stairs, columns, slabs, tables, and beams.
  • Crane Efficiency: Does not require crane for assembly, allowing crane use for other tasks.
  • Certified Quality: Products certified with ISO and CE standards for reliability.
  • Customizable Options: Formwork can be customized to meet specific project requirements.

Product Images of 6061-T6 Aluminum Formwork for Swift Construction

6061-T6 Aluminum Formwork for Swift Construction pictures & photos
6061-T6 Aluminum Formwork for Swift Construction
6061-T6 Aluminum Formwork for Swift Construction pictures & photos
6061-T6 Aluminum Formwork for Swift Construction
6061-T6 Aluminum Formwork for Swift Construction pictures & photos
6061-T6 Aluminum Formwork for Swift Construction
6061-T6 Aluminum Formwork for Swift Construction pictures & photos
6061-T6 Aluminum Formwork for Swift Construction
6061-T6 Aluminum Formwork for Swift Construction pictures & photos
6061-T6 Aluminum Formwork for Swift Construction
6061-T6 Aluminum Formwork for Swift Construction pictures & photos
6061-T6 Aluminum Formwork for Swift Construction
  • 6061-T6 Aluminum Formwork for Swift Construction
    6061-T6 Aluminum Formwork for Swift Construction
  • 6061-T6 Aluminum Formwork for Swift Construction
    6061-T6 Aluminum Formwork for Swift Construction
  • 6061-T6 Aluminum Formwork for Swift Construction
    6061-T6 Aluminum Formwork for Swift Construction
  • 6061-T6 Aluminum Formwork for Swift Construction
    6061-T6 Aluminum Formwork for Swift Construction
  • 6061-T6 Aluminum Formwork for Swift Construction
    6061-T6 Aluminum Formwork for Swift Construction
  • 6061-T6 Aluminum Formwork for Swift Construction
    6061-T6 Aluminum Formwork for Swift Construction

Find Similar Products

Product Description

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation After short period of training, workers can easily learn to install and dismantle the formwork.
3.Construction period 3-5 days per storey.
4.Machine assistance Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used.
5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.
6061-T6 Aluminum Formwork for Swift Construction6061-T6 Aluminum Formwork for Swift Construction6061-T6 Aluminum Formwork for Swift Construction6061-T6 Aluminum Formwork for Swift Construction

6061-T6 Aluminum Formwork for Swift Construction


Our durable and efficient aluminum formwork is perfect for swift construction projects. With versatile wall, stair, column, slab, table, and beam formwork, it offers convenience and reliability. Lightweight and easy-to-use, it ensures precise and secure results. Choose our customizable formwork for efficient and durable construction.

6061-T6 Aluminum Formwork for Swift Construction

Shipment:


Introducing the 6061-T6 Aluminum Formwork for Swift Construction by SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. This durable and efficient formwork is perfect for versatile wall, stair, column, slab, table, and beam construction. It's lightweight, easy-to-use, and customizable for all your construction needs.

6061-T6 Aluminum Formwork for Swift Construction
Certificate:


Company Name: SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.


Product Name: 6061-T6 Aluminum Formwork for Swift Construction


Keywords: Formwork for construction, Aluminum panel formwork, Swift construction formwork, Durable aluminum formwork, Efficient concrete formwork, Versatile wall formwork, Sturdy stair formworks, Reliable column mould, Monolithic casting formwork, Aluminum slab formwork, Aluminum table formwork, High-quality beam formwork, Innovative wall formwork, Advanced stair formwork, Aluminum scaffold, Lightweight formwork, Easy-to-use panel formwork, Aluminum prop for formwork, Aluminum concrete formwork, Customizable column formwork, Precise slab formwork, Efficient table formwork, Secure beam formwork, Convenient wall formwork, Durable stair formwork


6061-T6 Aluminum Formwork for Swift Construction6061-T6 Aluminum Formwork for Swift Construction6061-T6 Aluminum Formwork for Swift Construction

About the Supplier

This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASR2552042". Items marked "verified" are certified.

Watch Video
Watch Video
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.

About Our Factory & Business Background

Address
Lu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main Products
Concrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is the construction period for this formwork?
The construction period is 3-5 days per storey.
Is plastering required after removing the formwork?
No, the smooth effect after removing the formwork means there is no need to plaster.
What is the load capacity of the aluminum formwork?
The load capacity is 60 KN per square meter.
Does the installation require a crane?
No, it does not require a crane for shifting and assembly.
What is the scrap value of the formwork?
The scrap value is about 50% of the new panel.
What certifications does the product have?
The product has ISO and CE certifications.
Is the formwork customizable?
Yes, the formwork is customizable for all your construction needs.
What is the warranty period?
The warranty period is 1 year.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now