Durable Aluminum Formwork for Concrete Construction
Contact Supplier
Product Highlights
- Lightweight & Strong Material: Made from durable Aluminum alloy 6061-T6 for strength and ease of handling.
- No Plastering Required: Smooth finish after removal eliminates the need for additional plastering costs.
- High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load distribution.
- Rapid Construction Speed: Construction period is 3-5 days per storey for efficient project completion.
- No Crane Assistance Needed: Does not require a crane for shifting and assembly, optimizing equipment usage.
- High Scrap Value: Scrap value is approximately 50% of the new panel cost.
- Easy Installation: Workers can easily learn to install and dismantle after a short training period.
- ISO & CE Certified: Product meets international quality standards with ISO and CE certifications.
Product Attributes
- Customization
- Available
- After-sales Service
- Available
- Warranty
- 1 Years
- Model NO.
- MP
- Certification
- ISO, CE
- Material
- Steel
- Type
- Wall Formwork
- Code
- 6061-T6
- Construction Period
- 5 Days
- Load Capacity
- 60kn
- After Sale Service
- Available
- Transport Package
- Standard
- Trademark
- MACPEX
- Origin
- China
- HS Code
- 8480411000
- Production Capacity
- 50000
Product Images of Durable Aluminum Formwork for Concrete Construction
Find Similar Products
Product Description
| Items | Aluminium formwork |
| 1. Material | Aluminium alloy 6061-T6 |
| 2.Installation | After short period of training, workers can easily learn to install and dismantle the formwork. |
| 3.Construction period | 3-5 days per storey. |
| 4.Machine assistance | Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used. |
| 5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted. |
| 6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
| 7.Formwork stability | The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting. |
| 8.Scrap value | The scrap value is about 50% of the new panel. |



Shipment:
We offer durable aluminum formwork for concrete construction. Our versatile formwork system is lightweight, strong, and rigid, providing efficient and high-quality concrete forming. With advanced techniques and cost-effective solutions, our formwork is the ideal choice for any construction project.
Certificate:
Company Name: SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
Product Name: Durable Aluminum Formwork for Concrete Construction
Keywords: Concrete forms, Aluminum formwork system, Concrete wall formwork, Stair formwork system, Column formwork molds, Monolithic concrete casting, Aluminum slab forms, Aluminum table forms, Aluminum beam formwork, Aluminum wall form system, Aluminum stair molds, Scaffolding for formwork, Formwork solutions, Advantages of aluminum formwork, Efficient concrete forming, High-quality formwork system, Versatile formwork options, Lightweight formwork materials, Strong and rigid formwork, Advanced concrete forming techniques, Cost-effective formwork solutions, Time-efficient formwork system


About the Supplier
Company Profile
Our company is founded in 2006 and headquartered in Qingdao, a world class hub port, with three major manufacturing bases located in Qingdao, Qingzhou, and Weifang. Shandong, as a leading province in China's machinery manufacturing industry, represents the top-tier quality of machinery manufacturing in China. This industrial cluster advantage brings us cost advantages and innovative development for our enterprises.
Our products cover ready mix and precast concrete mixing production line, dry mix plant, dry mortar production line, asphalt mixing production lines, concrete forming equipment production lines, such as RCC pipe making machines, trench forming machines, concrete sprayer vehicles and building material recycling production lines. Products obtained the CE certificate.
We are a team with 20 years of experience in manufacturing mixing equipment. Our technical backbone with exceptional innovation capabilities and industry insights. We aspire to reach the Apex of machinery manufacturing, which is the origin and goal of Macpex. Mix for value is our unwavering pursuit, motivating us to deliver value to our customers through our high-quality products.
We possess the ability to offer non-standard, tailored solutions, providing customers in over 50 countries worldwide with both standard and specially customized equipment solutions. Our marketing team is always ready to answer customer inquiries promptly, offering personalized optimal solutions. Our services are efficient, timely, professional, and meticulous. Our professional logistics team ensures prompt delivery, while our experienced installation team handles on-site after-sales, installation, and debugging to perfection.
About Our Factory & Business Background
- Address
- Lu Jia Cun Industrial Park, Qingdao, Shandong, China
- Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
FAQ
- What is the material of the formwork?
- The formwork is made from Aluminum alloy 6061-T6, which is lightweight yet strong.
- How long does it take to construct one storey?
- The construction period is typically 3 to 5 days per storey.
- Is a crane required for installation?
- No, the system does not require a crane for shifting and assembly.
- Do I need to plaster the walls after removing the formwork?
- No, the smooth finish eliminates the need for plastering.
- What is the load capacity of the formwork?
- The load capacity is 60 KN per square meter.
- What is the warranty period?
- We provide a 1-year warranty for the product.
- What certifications does the product have?
- The product is certified with ISO and CE standards.
- What is the scrap value of the formwork?
- The scrap value is about 50% of the cost of a new panel.
Send your message to this supplier
People who viewed this also viewed
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
-
US$50.00-100.00 / Square Meter
Find Similar Products By Category
- Supplier Homepage
- Products
- Construction machinery
- Forms
- Durable Aluminum Formwork for Concrete Construction
Related Categories
Hot Searches
- China Aluminum Factories
- Aluminum Profile Factories
- Aluminum Frame Factories
- Aluminum Panel Factories
- Aluminum Formwork
- Construction Concrete Formwork
- Formwork Concrete Plywood
- Concrete Formwork Timber
- Steel Concrete Formwork
- Top 10 Aluminum
- Aluminum Trends
- Concrete Forms Bulkbuy