After-sales Service: | Available |
---|---|
Warranty: | 1 Years |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Items | Aluminium formwork |
1. Material | Aluminium alloy 6061-T6 |
2.Installation | After short period of training, workers can easily learn to install and dismantle the formwork. |
3.Construction period | 3-5 days per storey. |
4.Machine assistance | Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used. |
5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted. |
6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
7.Formwork stability | The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting. |
8.Scrap value | The scrap value is about 50% of the new panel. |
Discover our versatile and durable column mould formwork, designed for precise and efficient construction. With innovative features and a robust design, our formwork ensures reliable and flexible results. Perfect for monolithic casting and suitable for various applications, including wall and stair construction. Choose our lightweight aluminum or sturdy steel prop formwork for your next project. Experience the difference with SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. offers the Column Mould Formwork for Exact Construction. This versatile and durable formwork system is ideal for precise and efficient construction. It includes panel formwork, H20 formwork, steel prop formwork, and more. Achieve reliable and innovative results with this reliable and robust solution.