After-sales Service: | Available |
---|---|
Warranty: | 1 Years |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Items | Aluminium formwork |
1. Material | Aluminium alloy 6061-T6 |
2.Installation | After short period of training, workers can easily learn to install and dismantle the formwork. |
3.Construction period | 3-5 days per storey. |
4.Machine assistance | Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used. |
5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted. |
6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
7.Formwork stability | The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting. |
8.Scrap value | The scrap value is about 50% of the new panel. |
Discover our durable and versatile Steel Prop Formwork, designed for heavy load capacity. Perfect for wall, column, and stair construction, our innovative formwork solutions ensure efficient and reliable results. Choose from a range of highload options, including H20, aluminum, and concrete formwork. Experience precision and robustness with our sturdy and reliable formwork systems.
Discover our durable and versatile steel prop formwork, designed for heavy load capacity. Perfect for monolithic casting, our highload formwork solution ensures reliable and efficient construction. Choose from a range of panel, H20, aluminum, and concrete formwork options to suit your needs. Experience precision and innovation with our robust wall, stair, and column moulds. Trust in our sturdy scaffold for heavy load capacity. Upgrade your construction process with our reliable and efficient formwork solutions.