After-sales Service: | Available |
---|---|
Warranty: | 1 Years |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Items | Aluminium formwork |
1. Material | Aluminium alloy 6061-T6 |
2.Installation | After short period of training, workers can easily learn to install and dismantle the formwork. |
3.Construction period | 3-5 days per storey. |
4.Machine assistance | Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used. |
5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted. |
6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
7.Formwork stability | The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting. |
8.Scrap value | The scrap value is about 50% of the new panel. |
Introducing our panel formwork for quick construction periods. Our innovative and efficient formwork system includes high-speed H20 formwork, durable steel props, lightweight aluminum formwork, versatile concrete formwork, and more. With our reliable and optimized construction panel formwork, you can achieve exceptional results in a shorter time frame.
Certificate:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. offers a versatile and efficient panel formwork solution for quick construction periods. Our high-speed H20 formwork, durable steel props, and lightweight aluminum formwork ensure streamlined monolithic casting and precise column molds. With our advanced aluminum slab, table, beam, wall, and stair formwork, along with a sturdy scaffold, our reliable formwork solution optimizes construction panel formwork for exceptional results.