• H20 Formwork for Efficient Construction Periods
  • H20 Formwork for Efficient Construction Periods
  • H20 Formwork for Efficient Construction Periods
  • H20 Formwork for Efficient Construction Periods
  • H20 Formwork for Efficient Construction Periods
  • H20 Formwork for Efficient Construction Periods

H20 Formwork for Efficient Construction Periods

After-sales Service: Available
Warranty: 1 Years
Certification: ISO, CE
Material: Steel
Type: Wall Formwork
Code: 6061-T6
Diamond Member Since 2018

Suppliers with verified business licenses

Basic Info.

Model NO.
MP
Construction Period
5 Days
Load Capacity
60kn
After Sale Service
Available
Transport Package
Standard
Trademark
MACPEX
Origin
China
HS Code
8480411000
Production Capacity
50000

Product Description

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation After short period of training, workers can easily learn to install and dismantle the formwork.
3.Construction period 3-5 days per storey.
4.Machine assistance Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used.
5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.
H20 Formwork for Efficient Construction PeriodsH20 Formwork for Efficient Construction PeriodsH20 Formwork for Efficient Construction PeriodsH20 Formwork for Efficient Construction Periods

H20 Formwork for Efficient Construction Periods


Discover our efficient formwork system for faster and reliable construction. Our versatile formworks save time and are strong and economical. Explore our range of efficient formwork accessories.


H20 Formwork for Efficient Construction Periods

Shipment:


Get efficient construction formwork from SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. Our H20 Formwork ensures quick and reliable construction. Perfect for walls, stairs, columns, slabs, beams, and more. Save time and money with our versatile and durable formwork systems.

H20 Formwork for Efficient Construction Periods
Certificate:

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. presents the H20 Formwork for Efficient Construction Periods. Our efficient formworks are designed for various construction needs, including walls, stairs, columns, slabs, tables, and beams. With our versatile and time-saving construction formwork systems, you can expect strong and reliable results. Explore our range of efficient formwork accessories for an economical and customized construction experience.

H20 Formwork for Efficient Construction PeriodsH20 Formwork for Efficient Construction PeriodsH20 Formwork for Efficient Construction Periods

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2018

Suppliers with verified business licenses

Registered Capital
3000000 RMB
Type of Ownership
Limited Company
Terms of Payment
LC, T/T, D/P, PayPal, Small-amount payment