Cost Effective Aluminum Formwork From Manufacturer

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
  • Audited Supplier
  • 9 yrs

Contact Supplier

Product Highlights

  • Fast Construction Speed: 3-5 days per storey with easy installation after short training.
  • High Load Capacity: 60 KN per square meter ensuring stability and preventing shifting.
  • No Plastering Needed: Smooth surface after removal eliminates plastering costs.
  • Crane Efficiency: No crane required for assembly, allowing use for other activities.
  • High Scrap Value: Scrap value is about 50% of the new panel cost.
  • Quality Assurance: Firm structure prevents bursting, saving cleaning and concrete costs.

Product Images of Cost Effective Aluminum Formwork From Manufacturer

Cost Effective Aluminum Formwork From Manufacturer
Cost Effective Aluminum Formwork From Manufacturer pictures & photos
Cost Effective Aluminum Formwork From Manufacturer
Cost Effective Aluminum Formwork From Manufacturer pictures & photos
Cost Effective Aluminum Formwork From Manufacturer
Cost Effective Aluminum Formwork From Manufacturer pictures & photos
Cost Effective Aluminum Formwork From Manufacturer
Cost Effective Aluminum Formwork From Manufacturer pictures & photos
Cost Effective Aluminum Formwork From Manufacturer
Cost Effective Aluminum Formwork From Manufacturer pictures & photos
Cost Effective Aluminum Formwork From Manufacturer
Cost Effective Aluminum Formwork From Manufacturer pictures & photos
Cost Effective Aluminum Formwork From Manufacturer
  • Cost Effective Aluminum Formwork From Manufacturer
  • Cost Effective Aluminum Formwork From Manufacturer
    Cost Effective Aluminum Formwork From Manufacturer
  • Cost Effective Aluminum Formwork From Manufacturer
    Cost Effective Aluminum Formwork From Manufacturer
  • Cost Effective Aluminum Formwork From Manufacturer
    Cost Effective Aluminum Formwork From Manufacturer
  • Cost Effective Aluminum Formwork From Manufacturer
    Cost Effective Aluminum Formwork From Manufacturer
  • Cost Effective Aluminum Formwork From Manufacturer
    Cost Effective Aluminum Formwork From Manufacturer
  • Cost Effective Aluminum Formwork From Manufacturer
    Cost Effective Aluminum Formwork From Manufacturer

Find Similar Products

Product Description

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation After short period of training, workers can easily learn to install and dismantle the formwork.
3.Construction period 3-5 days per storey.
4.Machine assistance Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used.
5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.
Cost Effective Aluminum Formwork From ManufacturerCost Effective Aluminum Formwork From ManufacturerCost Effective Aluminum Formwork From ManufacturerCost Effective Aluminum Formwork From Manufacturer
workshop:
Cost Effective Aluminum Formwork From Manufacturer

Shipment:
Cost Effective Aluminum Formwork From Manufacturer
Certificate:
Cost Effective Aluminum Formwork From ManufacturerCost Effective Aluminum Formwork From ManufacturerCost Effective Aluminum Formwork From Manufacturer

About the Supplier

Watch Video
Watch Video
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.

About Our Factory & Business Background

Address
Lu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main Products
Concrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is the warranty period?
We provide a 1-year warranty for the aluminum formwork.
Is after-sales service available?
Yes, after-sales service is available for our products.
What certifications does the product have?
The product is certified with ISO and CE standards.
What material is used for the formwork?
The formwork is made of Aluminium alloy 6061-T6.
How long does installation take?
Workers can easily learn to install and dismantle it after a short period of training.
What is the lead time for shipment?
Peak season lead time is one month, while off-season lead time is 1-3 months.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now