Light Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive Price

Product Details
After-sales Service: Available
Warranty: 1 Years
Certification: ISO, CE
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
3000000 RMB
Type of Ownership
Limited Company
Terms of Payment
LC, T/T, D/P, PayPal, Small-amount payment
  • Light Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive Price
  • Light Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive Price
  • Light Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive Price
  • Light Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive Price
  • Light Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive Price
  • Light Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive Price
Find Similar Products

Basic Info.

Model NO.
MP
Material
Steel
Type
Wall Formwork
Code
6061-T6
Construction Period
5 Days
Load Capacity
60kn
After Sale Service
Available
Transport Package
Standard
Trademark
MACPEX
Origin
China
HS Code
8480411000
Production Capacity
50000

Packaging & Delivery

Package Size
180.00cm * 130.00cm * 140.00cm
Package Gross Weight
1200.000kg

Product Description

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation After short period of training, workers can easily learn to install and dismantle the formwork.
3.Construction period 3-5 days per storey.
4.Machine assistance Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used.
5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.
Light Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive PriceLight Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive PriceLight Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive PriceLight Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive Price
workshop:
Light Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive Price

Shipment:
Light Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive Price
Certificate:
Light Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive PriceLight Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive PriceLight Weight Aluminum Formwork for High Rise Building by 6061-T6 with Competitive Price

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier