Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
  • Audited Supplier
  • 9 yrs

Contact Supplier

Product Highlights

  • High Load Capacity: Supports 60 KN per square meter with firm stability to prevent shifting.
  • No Plastering Needed: Smooth surface after removal eliminates the need for additional plastering costs.
  • Fast Construction Speed: Achieves 3-5 days per storey with easy installation and dismantling.
  • Crane Efficiency: No crane required for assembly, allowing crane use for other delayed activities.
  • High Scrap Value: Scrap value is approximately 50% of the new panel cost.
  • Material Durability: Made of Aluminium alloy 6061-T6, firm enough to prevent bursting.

Product Images of Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6

Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6 pictures & photos
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6 pictures & photos
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6 pictures & photos
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6 pictures & photos
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6 pictures & photos
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6 pictures & photos
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
  • Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
  • Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
    Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
  • Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
    Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
  • Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
    Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
  • Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
    Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
  • Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
    Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
  • Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
    Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6

Find Similar Products

Product Description

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation After short period of training, workers can easily learn to install and dismantle the formwork.
3.Construction period 3-5 days per storey.
4.Machine assistance Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used.
5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
workshop:
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6

Shipment:
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6
Certificate:
Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6Concrete Wall Stair Slab Column Aluminum Formwork for Housing Construction 6061-T6

About the Supplier

This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASR2552042". Items marked "verified" are certified.

Watch Video
Watch Video
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.

About Our Factory & Business Background

Address
Lu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main Products
Concrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is the material of the formwork?
The formwork is made of Aluminium alloy 6061-T6.
How long does the construction take per storey?
The construction period is 3-5 days per storey.
Is a crane required for installation?
No, it does not require a crane for shifting and assembly.
What is the load capacity of the formwork?
The load capacity is 60 KN per square meter.
Do I need to plaster the walls after removing the formwork?
No, the smooth effect after removing the formwork means there is no need to plaster.
What is the warranty period?
The warranty period is 1 year.
What certifications does the product have?
The product has ISO and CE certifications.
What is the scrap value of the formwork?
The scrap value is about 50% of the new panel.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now