After-sales Service: | Available |
---|---|
Warranty: | 1 Years |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Items | Aluminium formwork |
1. Material | Aluminium alloy 6061-T6 |
2.Installation | After short period of training, workers can easily learn to install and dismantle the formwork. |
3.Construction period | 3-5 days per storey. |
4.Machine assistance | Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used. |
5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted. |
6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
7.Formwork stability | The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting. |
8.Scrap value | The scrap value is about 50% of the new panel. |
Get high-quality, durable and affordable high-rise building formwork from SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. We offer competitive rates on panel formwork systems, H20 formwork, steel prop formwork, and more. Choose our reliable and efficient formwork solutions for your construction needs.
Find affordable suppliers of high rise building formwork. We offer panel formwork systems, H20 formwork, steel prop formwork, and aluminum formwork solutions. Our concrete formwork manufacturers provide wall, stair, and column mould forms. Choose our monolithic casting forms, aluminum slab and table formwork systems, and aluminum beam and wall formwork solutions. We are reliable suppliers of scaffold for formwork construction, offering customized column mould forms. Get high quality, durable, and efficient formwork solutions at competitive rates.