Panel Formwork for Fast Construction Periods

Product Details
After-sales Service: Available
Warranty: 1 Years
Certification: ISO, CE
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
3000000 RMB
Type of Ownership
Limited Company
Terms of Payment
LC, T/T, D/P, PayPal, Small-amount payment
  • Panel Formwork for Fast Construction Periods
  • Panel Formwork for Fast Construction Periods
  • Panel Formwork for Fast Construction Periods
  • Panel Formwork for Fast Construction Periods
  • Panel Formwork for Fast Construction Periods
  • Panel Formwork for Fast Construction Periods
Find Similar Products

Basic Info.

Model NO.
MP
Material
Steel
Type
Wall Formwork
Code
6061-T6
Construction Period
5 Days
Load Capacity
60kn
After Sale Service
Available
Transport Package
Standard
Trademark
MACPEX
Origin
China
HS Code
8480411000
Production Capacity
50000

Product Description

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation After short period of training, workers can easily learn to install and dismantle the formwork.
3.Construction period 3-5 days per storey.
4.Machine assistance Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used.
5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.
Panel Formwork for Fast Construction PeriodsPanel Formwork for Fast Construction PeriodsPanel Formwork for Fast Construction PeriodsPanel Formwork for Fast Construction Periods

Panel Formwork for Fast Construction Periods


Discover our customizable and efficient formwork systems for rapid construction. Our durable and cost-effective options include H20, steel prop, and aluminum formwork. Perfect for wall, stair, and column molding, as well as monolithic casting. Experience advanced, flexible, and modern construction with our panel forming systems.


Panel Formwork for Fast Construction Periods


Shipment:


Get fast construction with our panel formwork! Our customizable and efficient formwork systems, including H20, steel prop, and aluminum options, are perfect for wall, stair, and column construction. Experience rapid and durable construction with our advanced technologies.


Panel Formwork for Fast Construction Periods
Certificate:

Company Name: SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.


Product Name: Panel Formwork for Fast Construction Periods


Keywords: Formworks, Fast Construction Periods, H20 Formwork, Steel Prop Formwork, Aluminum Formwork, Concrete Formwork, Wall Formwork, Stair Formworks, Column Mould, Monolithic Casting, Aluminum Slab Formwork, Aluminum Table Formwork, Aluminum Beam Formwork, Aluminum Wall Formwork, Aluminum Stair Formwork, Scaffold Formwork, Formwork Panels, Panel Forming Systems, Rapid Construction Formwork, Customizable Formwork Solutions, Efficient Formwork Systems, Durable Construction Formwork, Cost-effective Formwork options, Flexible Construction Formwork, Advanced Formwork Technologies, Modern Construction Formwork


Attributes: None



Introducing our Panel Formwork for Fast Construction Periods. This versatile system includes H20 Formwork, Steel Prop Formwork, Aluminum Formwork, and more. Perfect for wall, stair, and column construction, it offers monolithic casting and efficient panel forming systems. Our customizable and durable formwork solutions are cost-effective and flexible, utilizing advanced technologies for modern construction needs.

Panel Formwork for Fast Construction PeriodsPanel Formwork for Fast Construction PeriodsPanel Formwork for Fast Construction Periods

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier