6061-T6 Aluminum Formwork with 5-Day Construction Period

Product Details
After-sales Service: Available
Warranty: 1 Years
Certification: ISO, CE
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
3000000 RMB
Type of Ownership
Limited Company
Terms of Payment
LC, T/T, D/P, PayPal, Small-amount payment
  • 6061-T6 Aluminum Formwork with 5-Day Construction Period
  • 6061-T6 Aluminum Formwork with 5-Day Construction Period
  • 6061-T6 Aluminum Formwork with 5-Day Construction Period
  • 6061-T6 Aluminum Formwork with 5-Day Construction Period
  • 6061-T6 Aluminum Formwork with 5-Day Construction Period
  • 6061-T6 Aluminum Formwork with 5-Day Construction Period
Find Similar Products

Basic Info.

Model NO.
MP
Material
Steel
Type
Wall Formwork
Code
6061-T6
Construction Period
5 Days
Load Capacity
60kn
After Sale Service
Available
Transport Package
Standard
Trademark
MACPEX
Origin
China
HS Code
8480411000
Production Capacity
50000

Product Description

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation After short period of training, workers can easily learn to install and dismantle the formwork.
3.Construction period 3-5 days per storey.
4.Machine assistance Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used.
5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.
6061-T6 Aluminum Formwork with 5-Day Construction Period6061-T6 Aluminum Formwork with 5-Day Construction Period6061-T6 Aluminum Formwork with 5-Day Construction Period6061-T6 Aluminum Formwork with 5-Day Construction Period

6061-T6 Aluminum Formwork with 5-Day Construction Period


Experience quick and efficient construction with our high-quality, durable, and versatile aluminum formwork system. Perfect for precise concrete formwork, our easy-to-use system includes wall forms, column molds, slab formwork, beam solutions, staircase design, scaffolding, and panel options. Trust our monolithic casting forms and H20 formwork systems for rapid and sturdy construction.


6061-T6 Aluminum Formwork with 5-Day Construction Period


Product Description


Introducing the 6061-T6 Aluminum Formwork by SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. This efficient and durable formwork system allows for quick and precise construction, with a 5-day construction period. Its high-quality and versatile design makes it easy to use for monolithic casting, slab, wall, beam, and staircase formwork. The system also includes aluminum props, panel formwork solutions, and an H20 formwork system. Experience rapid and reliable construction with our aluminum formwork.


6061-T6 Aluminum Formwork with 5-Day Construction Period
Certificate:

Company Name: SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.


Product Name: 6061-T6 Aluminum Formwork with 5-Day Construction Period


Keywords: Aluminum Formwork, Construction Formwork, Quick Construction Formwork, Efficient Formwork System, Rapid Formwork Construction, Durable Aluminum Formwork, Versatile Formwork System, High-Quality Formwork, Precise Concrete Formwork, Easy-to-Use Formwork, Aluminum Wall Forms, Sturdy Column Moulds, Monolithic Casting Forms, Slab Formwork System, Table Formwork for Concrete, Beam Formwork Solutions, Wall Formwork System, Staircase Formwork Design, Scaffold for Construction, Aluminum Prop for Formwork, Panel Formwork Solutions, H20 Formwork Systems, Panel Formwork for Walls, Aluminum Beam System, Stair Formwork Design

6061-T6 Aluminum Formwork with 5-Day Construction Period6061-T6 Aluminum Formwork with 5-Day Construction Period6061-T6 Aluminum Formwork with 5-Day Construction Period

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier