Wall Formwork for High Rise Building Projects

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
  • Audited Supplier
  • 9 yrs

Contact Supplier

Product Highlights

  • Fast Construction Period: 3-5 days per storey with efficient installation.
  • No Plastering Required: Smooth finish eliminates plastering costs after removal.
  • Crane-Free Assembly: Does not require crane for shifting, saving time and cost.
  • High Load Capacity: Supports 60 KN per square meter for uniform load distribution.
  • Durable Material: Made from firm Aluminium alloy 6061-T6 to prevent bursting.
  • High Scrap Value: Scrap value is approximately 50% of the new panel cost.
  • Easy Installation: Workers can learn to install and dismantle after short training.
  • ISO and CE Certified: Meets international safety and quality standards.

Product Images of Wall Formwork for High Rise Building Projects

Wall Formwork for High Rise Building Projects pictures & photos
Wall Formwork for High Rise Building Projects
Wall Formwork for High Rise Building Projects pictures & photos
Wall Formwork for High Rise Building Projects
Wall Formwork for High Rise Building Projects pictures & photos
Wall Formwork for High Rise Building Projects
Wall Formwork for High Rise Building Projects pictures & photos
Wall Formwork for High Rise Building Projects
Wall Formwork for High Rise Building Projects pictures & photos
Wall Formwork for High Rise Building Projects
Wall Formwork for High Rise Building Projects pictures & photos
Wall Formwork for High Rise Building Projects
  • Wall Formwork for High Rise Building Projects
    Wall Formwork for High Rise Building Projects
  • Wall Formwork for High Rise Building Projects
    Wall Formwork for High Rise Building Projects
  • Wall Formwork for High Rise Building Projects
    Wall Formwork for High Rise Building Projects
  • Wall Formwork for High Rise Building Projects
    Wall Formwork for High Rise Building Projects
  • Wall Formwork for High Rise Building Projects
    Wall Formwork for High Rise Building Projects
  • Wall Formwork for High Rise Building Projects
    Wall Formwork for High Rise Building Projects

Find Similar Products

Product Description

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation After short period of training, workers can easily learn to install and dismantle the formwork.
3.Construction period 3-5 days per storey.
4.Machine assistance Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used.
5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.
Wall Formwork for High Rise Building ProjectsWall Formwork for High Rise Building ProjectsWall Formwork for High Rise Building ProjectsWall Formwork for High Rise Building Projects

Wall Formwork for High Rise Building Projects


Our Wall Formwork is designed for high rise construction projects, providing a reliable and efficient solution for concrete walls, stairs, and columns. With our aluminum formwork systems, monolithic casting becomes easier and faster. Our formwork panels, scaffold systems, and H20 formwork systems ensure precise and sturdy construction. Choose our formwork solutions for seamless construction of walls, stairs, and beams in high rise buildings.

Wall Formwork for High Rise Building Projects


Product Description:


Discover our high-quality Wall Formwork for High Rise Building Projects. Our formwork systems are designed to provide efficient and reliable solutions for concrete walls, stairs, columns, slabs, and beams. With our aluminum and steel prop formwork options, you can achieve seamless construction and monolithic casting. Explore our range of panel, H20, and table formwork systems for your high rise construction needs.


Wall Formwork for High Rise Building Projects
Certificate:


Company Name: SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.


Product Name: Wall Formwork for High Rise Building Projects


Keywords: Wall Formwork, High Rise Building Formwork, Concrete Wall Formwork, Stair Formwork Systems, Column Mould for High Rise Buildings, Monolithic Casting Formwork, Aluminum Slab Formwork, Aluminum Table Formwork, Aluminum Beam Formwork System, Aluminum Wall Formwork Panels, Aluminum Stair Formwork Solutions, Scaffold Systems for Formwork, Formwork for High Rise Construction, Panel Formwork for Walls, H20 Formwork Systems, Steel Prop Formwork, Aluminum Formwork Solutions, Formwork for Concrete Walls, Formwork Systems for Stairs, Column Mould for Formwork, Monolithic Casting Solutions, Slab Formwork Systems, Table Formwork for High Rise Buildings, Beam Formwork for Walls, Stair Formwork Construction


Wall Formwork for High Rise Building ProjectsWall Formwork for High Rise Building ProjectsWall Formwork for High Rise Building Projects

About the Supplier

Watch Video
Watch Video
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.

About Our Factory & Business Background

Address
Lu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main Products
Concrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is the construction period for one storey?
The construction period is 3-5 days per storey.
Is a crane required for assembly?
No, the system does not require a crane for shifting and assembly.
Do I need to plaster the walls after removing the formwork?
No, the smooth effect eliminates the need for plastering.
What is the load capacity of the formwork?
The load capacity is 60 KN per square meter.
What material is used for the formwork?
It is made of Aluminium alloy 6061-T6.
What is the warranty period?
We provide a 1-year warranty.
Is after-sales service available?
Yes, after-sales service is available.
What is the scrap value of the panels?
The scrap value is about 50% of the new panel.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now